Silvercrest Energy Group successfully designed and installed a 27.06kWp commercial solar PV and battery storage system for The Experience Project at Whittingham Methodist Church. The bespoke renewable energy solution was developed to reduce operational energy costs, improve long-term energy resilience and support the organisation’s sustainability objectives.
The Experience Project at Whittingham Methodist Church is a community organisation providing facilities for worship, education and local activities throughout the week. With consistent daytime and evening electricity demand, the site was ideally suited to a combined solar PV and battery storage solution.
Project
Commercial Solar Panel and Battery Storage Installation
Client
Whittingham Methodist Church
What We Did
Designed, supplied and installed a bespoke 27.06kWp commercial solar PV system with integrated 20.48kWh battery storage, including site surveys, system design, installation, commissioning and performance monitoring.
Energy Performance Comparison
| Performance Metric | Before Installation | After Installation |
|---|---|---|
| Annual Grid Electricity Consumption | 23,738 kWh | 11,869 kWh |
| Annual Energy Costs | £7,997.33 + standing charges | £3,998.66 + standing charges |
| Reduction in Grid Electricity Consumption | — | Approximately 50% |
The Experience Project at Whittingham Methodist Church was experiencing high annual electricity consumption and increasing operating costs, making a commercial solar PV and battery storage system a practical long-term investment.
Following installation, recent billing data demonstrates a significant reduction in grid electricity consumption and energy expenditure. The system has reduced reliance on imported electricity by approximately 50%, confirming that it is performing above the original design projections while delivering greater-than-expected financial savings.
Financial Outcomes
Initial Projections
(Pre-Installation)
5,846.36
214,817.42
6
Updated Projections (One Year On)
8,033.06
591,135.71
4
Environmental Impact
Via system monitoring we can see that Whittingham Methodist Church has already achieved:
26.01
35.64
29.76
This positions The Experience Project as a leading example of environmental stewardship within the local community.
Outcome
The commercial solar PV and battery storage installation at The Experience Project, Whittingham Methodist Church has delivered outstanding operational and financial results. By significantly reducing grid electricity consumption and outperforming its original financial projections, the system is providing long-term energy cost savings, improved energy resilience and measurable environmental benefits.
The addition of battery storage has further enhanced system performance by maximising on-site use of renewable electricity and reducing reliance on imported energy. The project demonstrates how integrated commercial solar and battery storage can deliver exceptional long-term value for community organisations with diverse energy demands.
This installation is a strong example of how carefully engineered renewable energy solutions can support sustainability objectives while providing a reliable, cost-effective energy supply for years to come.
Ready to Reduce Your Organisation's Energy Costs?
Whether you manage a place of worship, community organisation, education facility or commercial premises, Silvercrest Energy Group can design a bespoke solar PV and battery storage solution tailored to your energy requirements and long-term objectives.
From feasibility studies and technical design through to installation, commissioning and ongoing support, our experienced engineering team delivers fully managed renewable energy projects that reduce operational energy costs, improve energy resilience and support your sustainability goals.