Silvercrest Energy Group successfully designed and installed an 83.27kWp commercial solar PV system at Newington Green Primary School, helping the school reduce operational energy costs, improve long-term energy resilience and support its sustainability objectives.
Working in partnership with certified roofing specialists, the installation was carefully engineered to integrate with the school’s existing flat roof system while maintaining the manufacturer’s warranty. The project demonstrates how commercial solar can deliver significant financial and environmental benefits for education facilities without compromising existing infrastructure.
Project
Commercial Solar Panel Installation
Client
Newington Green Primary School
What We Did
Designed, supplied and installed a bespoke 83.27kWp commercial solar PV system, including feasibility studies, technical design, certified flat roof integration, installation, commissioning and performance monitoring. The project was delivered in collaboration with Bauder Approved Contractors to ensure full compatibility with the existing roofing system while protecting the school’s long-term investment.
The Client
Newington Green Primary School is a busy primary education facility with significant daytime electricity demand, making it ideally suited to commercial solar PV generation. The school wanted to reduce long-term operating costs, lower carbon emissions and invest in renewable energy that would benefit both current and future generations of pupils.
The Challenge
The project had two key objectives:
- Reduce long-term operational energy costs.
- Protect the existing flat roof warranty throughout the installation.
As the building featured a Bauder flat roofing system, the solar installation required specialist integration using approved installation methods. Silvercrest Energy Group worked alongside Bauder Approved Contractors to ensure the solar PV mounting system was installed without compromising the roof’s integrity or existing warranty.
Community Partnership
This project was made possible through the remarkable commitment of Newington Green Primary School, the Newington Green Action Group, local businesses and families.
Over a two-year period, the community raised funds through local events, fundraising initiatives and support from the Aviva Community Fund, enabling the school to invest in a long-term renewable energy solution. The project demonstrates how collaboration between schools, local organisations and specialist contractors can deliver lasting environmental and financial benefits.
Financial Benefits
Following detailed site surveys and energy modelling, Silvercrest Energy Group designed a bespoke 83.27kWp commercial solar PV system tailored to the school’s daytime electricity demand and available roof space.
Commissioned in September 2025, the system has already generated more than 5.6MWh of renewable electricity and is expected to produce approximately 77,353kWh each year, significantly reducing reliance on imported electricity while supporting the school’s sustainability objectives.
14,683.57
621,267.07
7
13.4
A Model for Sustainable Schools
By investing in solar energy – funded through community actions and installed using certified methods – Newington Green Primary School is setting an inspiring example of how educational institutions can:
- Reduce their carbon footprint
- Lower long term energy costs
- Protect vital infrastructure
- Empower their communities
- Lead future generations toward a greener, more resilient future
If you would like to find out how your school can save money, reduce their carbon footprint and invest in sustainability contact Silvercrest Energy UK today.
Installation Process
Protecting the school’s existing roofing system was a critical element of the project.
Working alongside Bauder Approved Contractors, Silvercrest Energy Group delivered a specialist flat roof installation using approved mounting methods that ensured:
- Full compatibility with the existing Bauder roofing system.
- Protection of the manufacturer’s roof warranty.
- Long-term weatherproof performance.
- Safe, fully compliant installation.
- Minimal disruption to school operations.
The project was completed safely and efficiently, providing the school with complete confidence in the long-term durability and performance of both the roof and the solar PV system.
Engineer's Insight
Flat roof commercial solar installations require careful coordination between roofing specialists and solar engineers. By working with Bauder Approved Contractors, we were able to integrate the Nicholson Rooftek mounting system while maintaining the integrity and warranty of the existing roof. This collaborative approach ensured the school benefited from a high-performance renewable energy system without compromising its long-term building asset.